|
Rope Tech has experience in a variety of IRATA rope access
engineering projects, ranging from the installation of cross
bracing, removal of redundant steelwork, oil and gas flare
tip replacement, structural welding and welding repairs in
difficult to access areas.
Our Team can install, maintain or repair without the need
for expensive scaffolding or staging.
RTI ENGINEERING PROJECTS
Gas terminal, steelwork installation, welding and inspection
of loading jetty
Welding of repair patches / structural supports
inside oil tankers
| |
FURTHER INFORMATION
|
|
| |
|
|
| |
-
OTHER PROJECTS
Oil Tankers - Removal of redundant communications
towers (vessel underway)
-
Cooling Towers - removal and installation of power
station attenuators (baffles) using crane lifts.
|
|
| |
|
|
|